Quotation · 1 working day reply · 0.5–50 m³/h
Request a quotation for a commercial water treatment system
Quick answer
Send the water analysis, daily and peak demand, source water, application and site conditions. The factory replies within one working day with a flow rate, process train, equipment scope and budget range. Standard skids ship in 15–30 days after drawing approval; containerized and turnkey plants take 30–60 days.
- Reply time
- [object Object] Reply time
- Flow range
- [object Object] Flow range
- Standard lead time
- [object Object] Standard lead time
- Turnkey lead time
- [object Object] Turnkey lead time
01
What should you send with the inquiry?
A complete request lets the factory size the system once and quote without assumptions. If a parameter is missing, the reply will state the assumption used.
- Laboratory report: TDS, hardness, iron, manganese, turbidity, pH, nitrate and bacteria
- Daily demand in m³/day and peak flow in m³/h
- Source water: municipal, well, river, lake, rain or brackish
- Application and target standard: drinking, food service, process, irrigation
- Site conditions: room size, power voltage, drain, ambient temperature
- Delivery target and any local certification requirement
02
How is the quotation built?
The quotation lists equipment, freight and commissioning as separate lines so offers can be compared. Prices depend on flow rate, feed water, pretreatment, materials, controls and scope; they are not published as list prices.
| Line | What it covers |
|---|---|
| Equipment | Pretreatment, RO or filtration skids, pumps, tanks, controls and disinfection |
| Membranes and media | Membrane elements, resin, sand, carbon and cartridge filters |
| Documentation | General arrangement drawing, P&ID, test record, O&M manual and spare-parts list |
| Freight and insurance | FOB, CIF or door delivery, packing and marine insurance |
| Commissioning | Remote support or on-site engineer, travel and operator training |
03
What lead time should you plan for?
Lead time starts after drawing approval and deposit, not from the inquiry date. Component availability and site-specific documentation can extend it.
| Configuration | Lead time |
|---|---|
| Standard skid | 15–30 days |
| Containerized plant | 30–60 days |
| Turnkey plant | 30–60 days, plus site works |
| Spare parts | 7–14 days |
Typical ranges; confirmed in the quotation.
04
What is included — and what is quoted separately?
The quotation states the boundary of supply. Items outside the boundary are listed so they can be priced by the local contractor.
- Included: equipment, factory testing, documentation and packing
- Included: remote commissioning support and operator training
- Quoted separately: freight, insurance, duties and local taxes
- Quoted separately: site works, piping, storage tanks and electrical installation
- Optional: on-site engineer, spare-parts package and extended warranty
05
What happens after the quotation is accepted?
The order moves through drawing approval, deposit, fabrication, factory testing and shipment. The quotation states which documents and inspection points are released at each stage.
- Drawing approval and deposit release the order
- Production photos or inspection reports on request
- Factory pressure test and trial run before packing
- Shipping documents: packing list, invoice, bill of lading and test record
Request a quotation
Request a quotation
Share the water source and daily demand. We reply with a sized system and a budget range.
FAQ
Frequently asked questions
Questions buyers actually ask during sizing and quotation. Answers match the specifications above.
01 How quickly will I receive a quotation?
02 Can you quote without a water analysis?
03 Do you publish list prices?
04 What payment terms do you use?
05 Can you ship to my country?
Related
Related pages
Next step
Send your water analysis, get a factory quotation
Tell us the source water, TDS, hardness, iron and daily demand. Factory engineers reply with a flow rate, process train and budget range within one working day.